| 9.1.1 BGA Component Rework Process Flow |
|
Printed Board Type: R/F/W/C
Skill Level: Advanced
Conformance Level: High
Revision: Pending
Revision Date: N/A
OUTLINE This document covers BGA component rework process flow
instructions.
INTRODUCTION
 |
| Ball Grid Array Rework Station |
|
This
document has been prepared by Circuit Technology Center, Inc.. The purpose is to
ensure repeatable, high quality rework of BGA components, and to assure
conformity to the highest industry standards and specifications.
NOTEThis document covers procedure
and guidelines specific to BGA component rework conducted by the staff at
Circuit Technology Center, Inc. Organizations using this information may need to
make modifications, or other changes, to accomodate their own particular needs.
INITIAL PROCESSING
- Receiving and Price Quoting
Upon arrival, each BGA component rework
project will be reviewed by the Circuit Technology Center Sales Department.
Personnel will refer to BGA Rework Process Worksheets when evaluating potential
BGA rework projects. Only appropriate scheduling personnel are authorized to
schedue a completion date.
- Repeat Projects
If the BGA component rework project appears to be one
that has been processed before, it should be checked in the BGA Rework Process
Worksheets. If the BGA component will require reballing, or if the BGA component
site will require modification, or repair, appropriate scheduling adjustment may
be required. Sales Department personnel will inform Production Manager about any
complexities to assure appropriate scheduling.
- New Projects
For all new projects the circuit board(s) and BGA
component(s) must be evaluated according to the BGA Rework Process Worksheet.
New BGA component rework projects require the following items to develop a
proper rework profile. (1) Assembled profile circuit board. (3) Profile
components for each BGA component rework location.
NOTE Customers must be made aware of the necessity
of these profile boards and components. In most cases it will be impossible to
proceed without these items. If these items are not available, BGA rework
projects must be reviewed on a case by case basis.
- Profiling
Much of our current profiling is done using the AirVac Smart
Trac System. This profiling system eliminates the necessity of drilling into the
board substrate in order to collect temperature data. However, one to three
reflow cycles will be needed to determine the proper profile of the component
location.
NOTE When an appropriate
profile circuit board is not available, the actual circuit board may be exposed
to multiple reflow cycles to determine the proper reflow cycle. These multiple
reflow cycles may degrade overall reliability.
- BGA Process Worksheets
Fill out the required information. If unsure
whether the board has been worked on previously, see the past BGA Rework Process
Worksheets. Note: Access to BGA Process Woprksheets requires a password.
If all items are present, work with the appropriate scheduling authority
for a schedule date. If any of the items are missing, discuss the shortage with
the Sales Department and notify customer if needed.
Once the BGA rework
project has been quoted it should be forwarded to Customer Service for order
entry and customer approval. If there are any outstanding issues including:
ordering stencils, nozzles, or reballing, ensure that the BGA Rework Department
is notified as soon as the order is approved.
NOTE When coding BGA projects use only the approved
codes.
- BGA Rework Process Worksheets
The continual changing of board/component
part numbers makes it difficult to determine whether a particular circuit board
and component location has previously been reworked. Refer to BGA Rework Process
Worksheets before beginning each repeat project. Note: Access to BGA Process
Woprksheets requires a password. STAGING/PREPARATION
- Staging
After each BGA rework project has logged and quoted, it will be
staged as follows:
Small Orders - Deliver directly to the BGA rework
area with appropriate labels. Loose boards with parts will be loaded into racks
marked "Incoming". Small boxes with parts will be brought to the rack marked
"Incoming Boxes".
Large Orders - Deliver to incoming holding area for
staging.
- Initial Inspection
When starting a new BGA rework project personnel
should consider the following:
- Verify circuit board and component part numbers and quantities against the
customer packing slip and Circuit Technology Center sales order.
- Determine the correct nozzle, stencil, and rework profile.
- Ensure circuit board will fit on the base of the BGA rework machine.
Oversized boards may require special handling.
- Visually inspect circuit boards for temperature sensitive components or
parts. (Fiber optics, plastic connectors, batteries, etc..)
- Review BGA Machine Preventive Maintenance Schedule. Ensure the appropriate
checks are done prior to operating BGA rework machines.
- BGA Component Handling
When starting a new BGA rework project personnel
should consider the following: BGA components may be sensitive to moisture.
If BGA parts are not received in sealed packages, those BGA parts must be baked
as follows:
- Remove BGA components from packaging.
- Place BGA components into a labeled tray. Tray must be labeled with Customer
Name, Sales Order No., Baking Start Time/Date.
- Bake BGA components at 125° C for 24 hours.
- After baking allow parts to cool to room temperature and immediately place
into sealed moisture barrier bags. Bags must be labeled with Customer Name and
Sales Order number. Bags must be placed into desiccant chamber.
BGA REWORK PROCESSING
- Initial Review/Disassembly
Operators should initially review all
paperwork. Assess circuit boards to determine need for any disassembly or
component masking. If disassembly is needed all materials must labeled and
instructions written to ensure that materials are replaced after rework.
- BGA Machine Inspection
The following should be checked prior to starting:
- Appropriate Nozzle Installed
- Rework Profile Available
- Proper Input Air Pressure
NOTE If this is the first piece in a larger
order it may require formal First Piece Inspection. See the Production Manager
or Inspection for guidance.
- Reflow Profile - Existing
Use the designated reflow profile if available.
If the reflow profile is not available on the particular BGA rework machine the
profile may be transferred from another machine.
- Reflow Profile - Creation
Each unique rework profile includes a removal
cycle, placement cycle, and site cleaning cycle. Refer to the following
procedures for details: 9.2.1 BGA Component Rework Profile Development, Standard
Method; 9.2.2 BGA Component Rework Profile Development, Smart Track Method
If no profile is available, an existing profile that closely matches the
component and board size, may be used. All parties must be aware of the inherent
risk in using common profiles.
|
|