Calibration Record CLR1072 Revision A  |   ECN292  |   Rev Date:

Weller WS80 Solder Station (CLR1072, S# 0498)


Written By: E. Farnham


Description
Weller WS80 Solder Station SN 0498

Make/Model
Weller WS80

Calibration Interval
Yearly

Next Calibration Due
Jul 20, 2008

Calibration Procedure

Using a calibrated thermometer attach a thermocouple to the tip of the iron and chack for units +/- tolerance acceptability.

Temperatures and acceptance ranges:

Set temperature at 800°. (Unit should hold temperature to +/- 10°)

Monitor for 4-5 minutes

Set temperature at 900°. (Unit should hold temperature to +/- 10°)

Monitor for 4-5 minutes



Calibration Log

Date    

Name of Calibration Monitor Pass / Fail
July, 20.2007  E. Farnham Pass


Index